Step by step construction . . .


Sometimes, starting a construction procedure can seem impossible to people. But, you can save a lot of time, nerves and money with correct planning and job organisation at the building-site. In short, we will remind you of the most important items during construction and try to put them in order. Every building-site must satisfy determined conditions – arranged building-site with available and regulated documentation. Building-site must be fenced off in order to prevent unauthorized access. But putting a fence near public surfaces is forbidden if it endangeres traffic and strollers in any way, and larger building-sites near roads must also have proper traffic signals. Constructor is under obligation to procure a permit from authorized district if he is temporary building on public traffic surface.

AT BUILDING-SITE CONSTRUCTOR MUST HAVE:

1 – juridical registration resolution,
2 – act of responsible person appointment,
3 – construction permit with major project and location permit with ideological project,
4 – final project including all changes and additions,
5 – construction diary,
6 – documentation of testing used construction products and equipment according to testing program from project, that is usage evidence; article 16., Construction Law
7 – structure report made by registrated person according to regulation

Remark: In case constructor is building for personal needs – a family house, secondary building, fence or hay-loft, he doesn't have to have documentation at number 1, 2, 5 and 6.


- Construction work are classified in different categories, and you will also need skilled workmen for some of your work. In short, we will try to demonstrate what to expect and what sequence to follow (in order to deal with things).



1. LAND WORK




- Taking off humpy(humus)
- Ground excavation
- Taking soil away on waste area
- Gravel strewing /BATUDA/ and ramming
- pit filling with soil
- humpy alluvion and putting grass on surface


2. REINFORCE-CONCRETE WORK




- Construction and setting armature
- Foundation concrete
- AB board concrete
- AB piers concrete
- AB walls concrete
- AB arcade concrete
- AB wreath concrete
- AB steps concrete
- roof board concrete


3. CARPENTER WORK




- One-sided paneling, support walls and canal construction
- Two-sided paneling, foundation and wall construction
- Three-sided paneling, board and steps construction
- Four-sided or circle paneling and pier construction
- Taking off the paneling
- Constructing all types of roof structures


4. HYDRO-ISOLATION WORK






- Horizontal isolation, floor, ceiling and roof construction
- Vertical isolation, walls, piers and steps cnstruction


5. BRICKLAYING





- Raising brick walls, partition and support walls
- Raising block walls, partition and support walls
- Raising facade brick walls
- Building chimney and ventilation canals
- Inside and outside cement glaze setting


6. ISOLATION WORK




- Thermal isolation, walls, ceiling, floor, roof
- Sound isolation, walls, ceiling, floor, roof

7. ELECTRIC INSTALLATION




- Design and setting of strong and week power installation

8. WATER INSTALLATION




- Supply and discharge pipe setting, connecting to waterwork

9. WINDOW CONSTRUCTION





- Making and installation of window construction, wood, wood-aluminium

10. PLASTER




- Exterior wall plaster
- Interior wall plaster
- Ceiling plaster
- Pier, beam and window arcade plaster


11. CERAMIC WORK




- Floor and wall ceramic setting
- Sanitary setting, bathroom equipment

12. PARQUET WORK






- Parquet setting


13. FINAL CONSTRUCTION WORK




- Carpenter work
- Locksmith work
- Tinsmith work
- Dropped ceilings
- Plaster work
- House-painter work

Following is interior decoration which will be even more complex to many of you than this raw construction work.